|
|
|
|
MXV Pumper – 3-Man Crown – Government of Nunavut
Loading...

MXV Pumper – 3-Man Crown – Government of Nunavut

Customer: GOVERNMENT OF NUNAVUT
City/Town: IQALUIT NUNAVUT
Delivery Date: SEPTEMBER 2021 / OCTOBER 2021 / SEA LIFT
Model Year: 2022
Chassis Make: FREIGHTLINER
Chassis Model: M2-106 / 2 DOOR
Body Style: 3 MAN CROWN / MXV BODY (HIGH – MEDIUM)
Body Construction: 5083 SALT WATER MARINE GRADE ALUMINUM
Salesman: RON LAVALLEE / FORT GARRY FIRE TRUCKS

Features: 

Extreme Insulation Package / Diesel Fired Coolant Heater / SCBA Rack / Shelves / Trays / Honda 5K Generator / Whelen Emergency Light Package / Porta Tank Rack / Overhead Ladder Rack

J0211-Kugaruuk Nunavut delivered September 2/21    J01212-Coral Harbour Nunavut anticipated delivery late October 2021.    Shipping was through the Port at Becancour QC.

Hanson Construction / Iqaluit NU is the FGFT Northern Partner

Loading...

Description

Customer: GOVERNMENT OF NUNAVUT
City/Town: IQALUIT NUNAVUT
Delivery Date: SEPTEMBER 2021 / OCTOBER 2021 / SEA LIFT
Model Year: 2022
Chassis Make: FREIGHTLINER
Chassis Model: M2-106 / 2 DOOR
Body Style: 3 MAN CROWN / MXV BODY (HIGH – MEDIUM)
Body Construction: 5083 SALT WATER MARINE GRADE ALUMINUM
Salesman: RON LAVALLEE / FORT GARRY FIRE TRUCKS

Features: 

Extreme Insulation Package / Diesel Fired Coolant Heater / SCBA Rack / Shelves / Trays / Honda 5K Generator / Whelen Emergency Light Package / Porta Tank Rack / Overhead Ladder Rack

J0211-Kugaruuk Nunavut delivered September 2/21    J01212-Coral Harbour Nunavut anticipated delivery late October 2021.    Shipping was through the Port at Becancour QC.

Hanson Construction / Iqaluit NU is the FGFT Northern Partner